The new administration of the Boquete Canyon Village project asked me to perform a total refit of the club house. As part of this, some major work was required for the landscaping of the site.
Click 'READ MORE' below to read this post.
The construction material above is from the other work I was conducting the actual building (explained in other posts)
The retro was needed to re rout some drainage systems.
After we began clearing and forming the land, we began the rock walls
Large base rocks where placed with the back hoe
The construction of the wall allowed us to level the ground to where we wanted it to be
We used flat rocks (hard to find!) to finish the top of the wall
The wall will provide a wonderful back drop to a large flower bed in the near future