Pages

House Cladded With Stone Work 2

In this post I am adding some more photos for the previous post House Cladded With Stone Work




So far the entire front of the house has been covered, and we are working along one side.


The carport arch as also been covered. The missing line of stone at the top will be added in after the eave material has been installed.


Smaller stones were used on the inside of arches because the weight of large ones. Being a sismic area, the risk of falling pieces is increased.


The concrete trim around each window helps make it stand out. These trims will eventually be painted.


Here we are beginning the side of the property.









No comments:

Post a Comment